{"id":1645,"date":"2014-01-01T12:00:37","date_gmt":"2014-01-01T11:00:37","guid":{"rendered":"https:\/\/www.bonassisadrillingcompany.it\/2014\/the-birth-of-bh-100\/"},"modified":"2014-01-01T12:00:37","modified_gmt":"2014-01-01T11:00:37","slug":"the-birth-of-bh-100","status":"publish","type":"post","link":"https:\/\/www.bonassisadrillingcompany.it\/en\/2014\/the-birth-of-bh-100\/","title":{"rendered":"The birth of BH 100"},"content":{"rendered":"<p>In <strong>2014<\/strong> a new hydraulic system, of the latest generation, called &#8220;<em>BH 100<\/em>&#8221; was designed specifically for Edison to perform a campaign of <em>light work <\/em>over and mining closures. The growth of turnover is fast and exponential, + 100% within a few months.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In 2014 a new hydraulic system.<\/p>\n","protected":false},"author":1,"featured_media":1442,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[40],"tags":[41,43,42],"_links":{"self":[{"href":"https:\/\/www.bonassisadrillingcompany.it\/en\/wp-json\/wp\/v2\/posts\/1645"}],"collection":[{"href":"https:\/\/www.bonassisadrillingcompany.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bonassisadrillingcompany.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bonassisadrillingcompany.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bonassisadrillingcompany.it\/en\/wp-json\/wp\/v2\/comments?post=1645"}],"version-history":[{"count":0,"href":"https:\/\/www.bonassisadrillingcompany.it\/en\/wp-json\/wp\/v2\/posts\/1645\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bonassisadrillingcompany.it\/en\/wp-json\/wp\/v2\/media\/1442"}],"wp:attachment":[{"href":"https:\/\/www.bonassisadrillingcompany.it\/en\/wp-json\/wp\/v2\/media?parent=1645"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bonassisadrillingcompany.it\/en\/wp-json\/wp\/v2\/categories?post=1645"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bonassisadrillingcompany.it\/en\/wp-json\/wp\/v2\/tags?post=1645"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}